Another good week saw us progress with the masonry to block 1 and start 1st fix mechanical also set out and board one side of the walls. In block 2 we have completed the plastering, once this as dried we can mist coat and 2nd fix the M&E. In block 3 we are fitting the kitchens and 2nd fix joinery (skirtings and architraves). The tiling is to start next week.