Friday, 26 April 2013

This week on Block 1 we got the scaffold ready for timber frame erection next Monday. The roofers continued tiling from Block 3 to Block 2. With the blocks now water tight we installed the insulation to the party wall and ceilings, enabling the dryliners to plasterboard the ceilings and walls. The bricklayers have also started on Block 3. We are really picking up pace with more work been available for the follow on trades.
 



 
 

Monday, 22 April 2013

We have had a busy couple of weeks installing the kerb race which allowed us to lay the base course tarmac to the road.Then we erected the scaffold to Blocks 2 and 3 which allowed us to erect the timber frame on schedule. We are now on with felt, battening and tiling the roof. We are continuing scaffolding to the perimeter of Block 1.
 


 
 
 

Tuesday, 2 April 2013

After the deluge of snow and dodging in and out of snow showers, we managed to continue to install the kerb race and stoning up the road and install some plot drainage, working towards tarmacing next week.

We also fixed the sole plates for the timber frame to block 2 and 3.