The freezing temperatures have slowed the process of building the retaining wall to the road elevation. Later on in the week the temperatures increased and we were able to complete the stonework. We continued with the installation of the mains drainage in the road. Also we completed the gabion walls to the rear of blocks 2 and 3. These are used instead of a concrete retaining wall, much more pleasing on the eye.