Thursday, 28 February 2013

This week saw us take delivery and install the block and beam flooring to blocks 1,2 and 3 with the use of a 35 ton crane. Next week we can build the perimeter block and lay the gas dpm and insulation ready to pour the concrete slabs. Keep your fingers crossed for no rain!
 
 